Charter Space

Software Built by Engineers, Trusted by Insurers

Modular Design icon

Modular Design

Fully modular and extensible systems engineering and mission planning

Insurance icon

Insurance

Save time and money with the most efficient route from build to quote

Requirements icon

Requirements

Manage requirement lifecycles from versioning through verification and validation

Test Management icon

Test Management

Plan, write, and log test procedures, executions, and outcomes

Scheduling icon

Scheduling

Keep track of deliverables with timeline-based system breakdowns

Block Diagrams icon

Block Diagrams

Map out your system architecture with rich context and detail on every interface

System of Record icon

Full System of Record

Track and preserve every change with a complete, documented history

Integrations icon

Integrates with your Stack

Works with existing software via integrations and APIs

Build with confidence

Take your mission from concept through completion with our full suite of tools for systems engineering, mission planning, and more.

Fly with assurance

  • Minimum insurable asset value = $2M
  • Lower prices, faster quotes, white-glove experience
  • Space: on-orbit, launch, and pre-launch
  • Commercial: D&O, E&O, General Liability, Cyber, etc.
  • Fully customizable coverage options tailored to mission requirements
  • No minimum flight heritage requirements

Manage Requirements

  • Collaboratively write, iterate on, and verify requirements with advanced conditional logic across your entire mission lifecycle.
  • Link requirements to components, tests, and even system properties for end-to-end traceability.
  • Keep teams synchronized with robust version control and release management.
Requirements management interface
Verification interface

Solve problems with Model Based Systems Engineering

  • Maintain clear designs with object-oriented systems architecture diagrams.
  • Stay on top of your system properties, margins, and budgets with intuitive notifications and permissioning.
  • Automate workflows by connecting to requirements and tests.
System architecture diagram
Diagram popup interface

Schedule, test, and manage resources easily

  • Monitor your entire mission with full insight into tasking across requirements, system designs, properties, and processes
  • Minimize disruptions and revert mistakes with version control for tasks.
  • Built-in analytics provide deeper insights into workload distribution and optimize resource utilization.
  • Robust test management to ensure unparalleled knowledge management and retention, built in collaboration with NASA JPL.
Gantt chart schedule view
Task popup interface

Works with all of your existing tools

  • Native integrations with tools including Microsoft OneDrive, Google Drive, Jira, Github, etc.
  • API provides full flexibility for integration with specialized tools
  • Added benefit of System of Record tracking for all data that passes through our software
Integrations interface

...and it all runs natively in your browser.

Charter platform browser interface
Gantt chart interface
System diagram interface
Team member Jon
Team member Anna
Team member Dave
Component mockup

What our users say

NASA logo
"Charter has a unique perspective on V&V processes that I think could make waves in large system integration."
Richard R.
Robotics Systems Engineer at NASA JPL
Propel Space logo
"The streamlined system-modeling approach within Ubik allows for rapid spacecraft development, well beyond standard practices."
Alex D.
CEO and Founder at Propel Space
Esper logo
"Ubik's the best way we've found to manage and organise not just our engineering processes, but also get our ducks in a row for compliance, licensing and insurance. The Charter team has built an excellent product that is 10x'ing our engineering and mission management as we build towards a large Earth Observation constellation."
Shoaib I.
Co-founder and CEO, Esper Satellite Imagery

Start building on Charter today.

Reach out today and let's explore how Charter can support your goals, big or small. We'd love to hear what you're building.